2.2 Meter readings
On the day you move into your new home you will be met by a representative from the Ipsus Aftercare Department, who will have read all of the meters for your electric and water supply and the heat meter for your heating and hot water supplied from the communal heating system. The meter details will be recorded on the Key Handover Form, a copy of which you will have been given for your own records.
In order for your move to go as smoothly as possible, Ipsus will arrange for the settlement of the final account bills that we are responsible for up to the date of the legal completion of your purchase and will also organise for your new details to be put on the billing accounts with the relevant utility companies.
As part of the paperwork you signed to complete your purchase you will have filled out an Energy Supply Agreement with Switch2, which your solicitor should have sent to them. Please do make sure this has happened. Once Switch2 have received your details they will open an account and send you a Welcome Pack.
A copy of the Switch2 Welcome Pack can also be viewed by clicking here.
You can view your meter readings on your energy display monitor, see Section 2.1 for more information on this.
Moving forward you are at liberty to change the utility supplier should you wish for those utilities that are individual to your apartment.
Please note you will be responsible for arranging for the connection of your incoming BT phone line and any internet access or television/radio services that require subscription.
The master phone sockets have been connected to the main DP in the basement plantroom. When you make arrangements with BT and are given a date for connection, the engineer will need to gain access to the data cabinet located in the cupboard in the hallway. The engineer may also require access to the DP for connection and testing, if so this will need to be arranged in advance with the Managing Agents.
Please bear in mind that it can take up to 6 weeks to get a broadband connection following the initial connection of the landline.